81-99 North Murray Street

You are here:
Go to Top
checklist_go

How we perform

Performance Details

checklist_go

How we perform

Management of resident sustainability impacts

checklist_go

How we perform

Emissions

checklist_go

How we perform

Water Management

checklist_go

How we perform

Energy Performance

Irrigation Wells Forest Ridge (2)_sq

Pilot project

Irrigation Well

We installed this well to tap into ground water for our lawn irrigation and to water plants and flowers around the community rather than pulling from the municipal water supply. The project generates financial savings of about $15,000 each year and we estimate annual water savings of 2,670m3 – the equivalent of one Olympic sized swimming pool. 

BAS 4

Pilot project

Enbridge Gas Project

We partnered with Enbridge Gas to install building automation system (BAS) upgrades at our Lakeshore Club community in Burlington. The project generates 38,200m3 in annual natural gas savings, a 40% reduction from pre-project levels, leading to cost savings and enhanced building operational control for our
facilities team, while ensuring continued resident comfort.

IMG_5713_edit

Pilot project

Smart Package Systemroll-out

We are currently testing this at communities in Montreal, Ottawa, and Burlington to solve the problem of package deliveries piling up in lobbies. Through this system, parcel couriers are provided with timed access to a secure package/lockers room and residents are notified electronically that a package is waiting for pick-up, thus providing a convenient, secure and organized package delivery system for our resident base.

microcogeneration

Pilot project

Micro cogeneration

We added a micro cogeneration unit to our Ottawa community, LIV, which produces heat and electrical power simultaneously through high efficiency heat and power generation. At LIV, this translates to a 17% offset in electrical consumption from the grid and a 20% reduction in domestic hot water production from boilers, leading to $25,000 in annual savings.

Pilot project

Urban Garden

With the help of our partner, MicroHabitat, we turned an unused portion of our roof at Appartements VIE in Montreal into a thriving urban garden, helping to reconnect people to nature. The 300-pound seasonal harvest was donated on a weekly basis to our community partner, Chez Doris, to support their daily meal program.

Pilot project

Solar Lights

When faced with having to dig up the pavement in our parking areas at Parkway Park to replace broken underground wiring, we pivoted to install solar lights and were able to keep our paved lots intact, minimize disruption to our residents, and bring a renewable source into our energy mix. Due to this successful test project, we expanded installation to the Forest Ridge properties.

Almost
0 %
of our communities have high efficiency boilers
1/3
of our team members are unitholders through our deferred unit plan.
Nearly
1/3
of our communities have programmable wi-fi or energy saving thermostats
More than
0 %
of our suites have low-flow toilets and majority of our portfolio has water-saving fixtures
Over
0 %
of our communities have fully modernized elevators
$600,000
spent on training, professional designations and memberships since 2015
A majority
of our suites are equipped with
ENERGY STAR® appliances
More than
$ 0
MILLIONS
in building refurbishments over the last decade
Industry Leading
cleaning program